After working non-stop, day and night, for a mere 20 months, the bathroom renovation project is finally done.
It seems like just yesterday that I started demolition.
What started off as a nice little project soon blossomed into nearly a whole-house renovation.
In addition to the bathroom itself I completed several other small projects along the way: wiring our master bedroom ceiling fan to the switch on the wall, installing a second ceiling light and a new wall switch in our upstairs hallway, installing a vent fan in our downstairs bathroom, insulating our attic crawl space, installing a new window which required taking down half of our vinyl siding, running a second HVAC duct to the upstairs, painting our pantry and installing new wire shelves, replacing the drain pipes for our downstairs bathtub and now I’m replacing two walls in the finished portion of our basement.
Ah, the joys of owning an old house…
I’m really pleased with the way the bathroom turned out. I did everything you see (and everything you don’t see) in the photos of the bathroom including: framing, drywall, mud and tape, subfloor, tiling, plumbing, electrical, HVAC, wainscoting, trim, painting and installation of the cabinets, shower door, hardware and toilet. Out of everything, I vow never to tile a shower again. Everything else was easy compared to that.
Now, for my next project….perhaps our garage should be a little larger…





p.s. If you want to see photos of the original bathroom, check out this post:
March 2007